03 – Spatial Coordinationuilding Control Approval
- Undertake Design Studies, Engineering Analysis and Cost Exercises to test Architectural Concept resulting in Spatially Coordinated design aligned to updated Cost Plan, Project Strategies and Outline Specification
- Initiate Change Control Procedures
- Prepare stage Design Programme